top of page
Recente berichten

Upper deck track installed

The upper deck is ready. On this deck the railway station (Funkenheim) and the village will be build.

The total height of the layout is now 1.3 meters.

The red area is the location of the upper deck.

Construction for the upper deck.

Plywood installed

Cork and tracks glued on the surface.


Volg ons
No tags yet.
Zoeken op tags
Archief
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page