Upper deck track installed
- edvonk
- Aug 15, 2016
- 1 min read
The upper deck is ready. On this deck the railway station (Funkenheim) and the village will be build.
The total height of the layout is now 1.3 meters.
The red area is the location of the upper deck.

Construction for the upper deck.

Plywood installed

Cork and tracks glued on the surface.

Comments