Upper deck track installed
The upper deck is ready. On this deck the railway station (Funkenheim) and the village will be build.
The total height of the layout is now 1.3 meters.
The red area is the location of the upper deck.
Construction for the upper deck.
Plywood installed
Cork and tracks glued on the surface.