top of page
Recente berichten

Upper deck track installed

  • edvonk
  • Aug 15, 2016
  • 1 min read

The upper deck is ready. On this deck the railway station (Funkenheim) and the village will be build.

The total height of the layout is now 1.3 meters.

The red area is the location of the upper deck.

Construction for the upper deck.

Plywood installed

Cork and tracks glued on the surface.


 
 
 

Comments


Volg ons
Zoeken op tags
Archief
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2023 by YOU DRIVE IT WE FIX IT.​ Proudly created with Wix.com

  • Google Square
  • Twitter Square
  • facebook-square
bottom of page