Middle deck track installed
- edvonk
- Jul 27, 2016
- 1 min read
The second level is ready and tested. It is like the lower level a shadow station with peace for 12 trains per deck. It looks similar to the lower deck. The lower deck will feed Funkenheim track 3 and 4. The middle deck will feed Funkenheim track 1 and 2.
Framework for middle deck

12 mm plywood

Installing track

many curves

Return track

Covered and protected for dust

Opmerkingen