Middle deck track installedThe second level is ready and tested. It is like the lower level a shadow station with peace for 12 trains per deck. It looks similar to...
Lower deck track installedThe shadow station (Holzburg) is ready and connected. Also there are main power cable to improve the power on the track. This will give a...