Installing tracks
- edvonk
- Jun 27, 2016
- 1 min read
It is time to instal tracks. As a base I am using 12 mm plywood. On top of the plywood I use 1.5 mm cork coming from Bangkok.
12 mm plywood

Cork and first tracks

The cork isolates the train sounds. The tracks are glued with a latex adhesive. Because I had 5 curves closely together I used Fleischmann flex-track. It can be bend it in the shape that I desire. The 5 radius I have is R3, R4, R5, R6 and R7
Installing a flex-track (using nails to keep it in place)

R3, R4, R5, R6 and R7 installed

Comentarios