

Building a control centre
My trains will be controlled by a software package called TrainController 7 Gold. For this I require 2 LED monitors and a laptop. I...


Stability for my model train table legs
I cut 30 pieces of wood to make my train table legs more stable. Most of my "dirty" work I do outside. At 36 grade Celcius in is not the...


Last table is installed
The last table has been put in place. Now I have to find out how I can manage my working space in an efficient way. It must be specious...


The first train tables are installed
After the paint was dry I decided to install the first tables. After it is more easy to take correct measurements for the other tables....


Painting the first segments
It is good weather outide for some painting activities. The colour of the frame will be choclade brown. These part are soon ready to...


Cutting Acasia wood
I use Acacia wood for my frame. Thailand doesn't offer a big range of different woods. Probably because of termites wood is not a...