

LED screens for TrainController installed
Finally my second LED screen has arrived. All is working perfect and I can test my lay-out already in simulation mode.


Power supply and connectors
The power supply has been build in. Also I made a drawer where I can make all kind of different connections to different voltages. De...


The power supply
The connect all the little lights in the houses, street lights, LED maintenance lights, servo drives, micro engines etc, it is nice to...


The ESU component cabinet
With minor changes my old cabinet will fit under my new table. It is important to have good acces to it, because I have to spend a lot of...


The background for my layout
My layout will be surrounded by a mountain landscape. For this I want to use a huge poster of 1414 cm long and 70 cm heigh. To do this I...


Building a control centre
My trains will be controlled by a software package called TrainController 7 Gold. For this I require 2 LED monitors and a laptop. I...


Stability for my model train table legs
I cut 30 pieces of wood to make my train table legs more stable. Most of my "dirty" work I do outside. At 36 grade Celcius in is not the...


Last table is installed
The last table has been put in place. Now I have to find out how I can manage my working space in an efficient way. It must be specious...


The first train tables are installed
After the paint was dry I decided to install the first tables. After it is more easy to take correct measurements for the other tables....


Painting the first segments
It is good weather outide for some painting activities. The colour of the frame will be choclade brown. These part are soon ready to...